Specification points
WJEC A Level Built Environment 1509QS
237 points in 4 topics, with WJEC's codes and titles.
Codes and titles are read by a script from WJEC's published specification and have not been checked by a person. What each point covers is in the specification itself: WJEC’s specification.
2.1 AS Unit 1: Our built environment
- 2.1.1 The life cycle of buildings and structures
- 2.1.1(a) Stages in the life cycle of buildings
- 2.1.2 Low-rise and high-rise structures in the built environment
- 2.1.2(a) Types of structures
- 2.1.2(b) Features of these structures
- 2.1.2(c) Uses and purposes of structures
- 2.1.3 Professional and technical careers and roles in the built environment
- 2.1.3(a) Architecture
- 2.1.3(b) Civil and structural engineering
- 2.1.3(c) Surveying
- 2.1.3(d) Site and project management
- 2.1.3(e) Quantity surveying
- 2.1.3(f) Town planning
- 2.1.3(g) Building services engineering
- 2.1.4 Organisations in the built environment
- 2.1.4(a) Small and medium-sized enterprises
- 2.1.4(b) Nationwide and global companies
- 2.1.4(c) Contracting and sub-contracting
- 2.1.4(d) Tendering, procurement and relevant legislation
- 2.1.4(e) Local authority planning departments
- 2.1.4(f) Trade and industry training bodies
- 2.1.4(g) Trade registration and development schemes
- 2.1.5 Structures of low-rise domestic and commercial buildings
- 2.1.5(a) On-site and off-site structural forms
- 2.1.5(b) The advantages and disadvantages of different structure types
- 2.1.5(c) Traditional (pre- 1919) structure types
- 2.1.5(d) Modular construction
- 2.1.6 Designing and constructing substructures (in contemporary practice)
- 2.1.6(a) Methods for investigating subsoil
- 2.1.6(b) Producing information for foundation design
- 2.1.6(c) Methods for improving subsoil
- 2.1.6(d) The types of building foundation
- 2.1.6(e) Principles for designing foundations
- 2.1.6(f) Basement excavation, retaining walls and damp-proof courses
- 2.1.7 Designing and constructing superstructures (in contemporary practice)
- 2.1.7(a) Types of ground floor construction
- 2.1.7(b) Types of intermediate floor construction
- 2.1.7(c) Designing stairs and open spaces
- 2.1.7(d) Types of internal wall and partitioning
- 2.1.7(e) External walls and cladding
- 2.1.7(f) Designing openings in walls
- 2.1.7(g) Finishing floors and ceilings
- 2.1.8 Designing the services requirements for buildings (in contemporary practice)
- 2.1.8(a) Services requirements for different types of buildings
- 2.1.8(b) The design of services at different points in the construction process
- 2.1.9 Change of use
- 2.1.9(a) Altering, refurbishing and extending existing buildings
- 2.1.9(b) Issues of compatibility and using consistent materials
- 2.1.9(c) Pre-1919 buildings and structures
- 2.1.10 External works
- 2.1.10(a) Foul and surface water drainage
- 2.1.10(b) Sustainable urban drainage systems
- 2.1.10(c) Installation/distribution of utility services
- 2.1.10(d) Methods for creating footpaths and roads
2.2 AS Unit 2: Design and planning practices
- 2.2.1 Stages involved in the design process
- 2.2.1(a) Stages 0 – 4 of the RIBA Plan of Work
- 2.2.1(b) The activities undertaken at each of these stages
- 2.2.2 Factors influencing the design process
- 2.2.2(a) Site information and constraints
- 2.2.2(b) Planning parameters and constraints
- 2.2.2(c) Statutory requirements and constraints
- 2.2.2(d) Environmental requirements and constraints
- 2.2.2(e) Social requirements and constraints
- 2.2.2(f) Budgetary and economic constraints
- 2.2.2(g) Construction (Design and Management) regulations
- 2.2.3 Initial project briefs
- 2.2.3(a) Setting project parameters
- 2.2.3(b) Setting project outcomes
- 2.2.3(c) Outlining possible design ideas and specifications
- 2.2.3(d) Writing briefs for a specific and intended audience
- 2.2.4 Producing designs
- 2.2.4(a) A range of 2D and 3D sketches and drawings
- 2.2.4(b) The techniques, principles and conventions of manual drawing
- 2.2.4(c) Technical, component and material annotations
- 2.2.5 Virtual modelling design
- 2.2.5(a) Using 2D and 3D virtual modelling outputs
- 2.2.5(b) Setting up virtual modelling projects and using common methodologies
- 2.2.5(c) Producing virtual models and rendering
- 2.2.6 Planning construction methods and techniques
- 2.2.6(a) The primary and secondary requirements of low-rise and medium-rise buildings
- 2.2.6(b) The requirements for working with buildings from different periods
- 2.2.6(c) Contemporary construction methods for substructures and superstructures
- 2.2.6(d) Sustainable construction methods, techniques and considerations
- 2.2.6(e) Water and waste water systems design and construction
- 2.2.6(f) Landscape design
- 2.2.6(g) Site design
2.3 A level Unit 3: Materials, technologies and techniques
- 2.3.1 Properties of materials
- 2.3.1(a) Properties defining uses of materials
- 2.3.1(b) Responses of materials to changing conditions
- 2.3.1(c) The factors that cause material degradation
- 2.3.2 Properties of construction materials
- 2.3.2(a) The properties of common materials used in construction processes
- 2.3.2(b) Manufacture and processing of materials
- 2.3.2(c) Temperature effects on construction materials
- 2.3.2(d) The load-bearing properties of construction materials
- 2.3.3 Degradation of construction materials
- 2.3.3(a) Causes of material degradation
- 2.3.3(b) Measures involved in preventing and reducing degradation
- 2.3.3(c) Solving issues caused by material degradation
- 2.3.3(d) Impact on the environment
- 2.3.4 Structural analysis and building comfort
- 2.3.4(a) Structural analysis of buildings/assets
- 2.3.4(b) Temperature changes and building users
- 2.3.4(c) Impacts of material properties on building acoustics and sounds
- 2.3.4(d) Determining the designs required for lighting in buildings/assets
- 2.3.5 Standards for measurements
- 2.3.5(a) Rules of measurement for construction projects
- 2.3.5(b) The rules of measurement for civil engineering projects
- 2.3.5(c) Producing quantities for substructures and superstructures
- 2.3.5(d) Producing quantities for civil engineering projects
- 2.3.5(e) Producing bills of quantities for building/asset projects
- 2.3.6 Thermal comfort
- 2.3.6(a) Scientific principles of thermal comfort
- 2.3.6(b) Controlling and managing heat
- 2.3.6(c) Moisture risks to buildings, including condensation and approaches to moisture management
- 2.3.7 Acoustic design of buildings and assets
- 2.3.7(a) Principles of measuring sound
- 2.3.7(b) Managing sound in buildings
- 2.3.7(c) The implications of sound design on building users and others
- 2.3.8 Lighting in buildings and of assets
- 2.3.8(a) Natural and artificial light in buildings
- 2.3.8(b) The methods of measuring light in buildings and of assets
- 2.3.9 Building services systems
- 2.3.9(a) The nature of energy and its use in building services systems
- 2.3.9(b) Energy forms in building services systems
- 2.3.9(c) The units, calculations and methods of calculating energy use and requirements
- 2.3.9(d) The links between structural design and energy consumption
- 2.3.9(e) Active and passive building services engineering design
- 2.3.9(f) Collaborative use of BIM
2.4 A level Unit 4: Construction practices
- 2.4.1a Residential and commercial properties
- 2.4.1a(a) The different types of commercial and residential properties in the built environment
- 2.4.1a(b) Architectural styles and periods of properties
- 2.4.1a(c) The impact of style and type on future maintenance
- 2.4.2a Building deterioration and degradation
- 2.4.2a(a) External defects and their repair
- 2.4.2a(b) Internal defects and their repair
- 2.4.3a Surveying equipment
- 2.4.3a(a) Manual and electronic equipment
- 2.4.3a(b) Relevant mathematical principles involved in using this equipment
- 2.4.4a Planning to conduct a building survey
- 2.4.4a(a) Sequence of surveying activities
- 2.4.4a(b) Health and safety planning
- 2.4.4a(c) Arranging access to relevant areas
- 2.4.5a Examining and recording findings
- 2.4.5a(a) State of repair of building elements
- 2.4.5a(b) Measuring the relevant dimensions related to findings
- 2.4.5a(c) Capturing appropriate and relevant evidence
- 2.4.6a Completing a building survey and measured survey
- 2.4.6a(a) The requirements of building survey and measured survey reports
- 2.4.6a(b) Producing scaled survey drawings
- 2.4.1b Linear, levelling and angular measurements
- 2.4.1b(a) Purpose and development of survey frameworks
- 2.4.1b(b) Measuring horizontal and sloped distances
- 2.4.1b(c) Traverse types in surveying
- 2.4.1b(d) The purposes, principles and methods of levelling
- 2.4.1b(e) The mathematical principles used in conducting the critical content above
- 2.4.2b Fieldwork surveys equipment
- 2.4.2b(a) Manual, electronic and technological equipment
- 2.4.2b(b) Interpreting fieldwork survey results
- 2.4.2b(c) The mathematical principles required when using the above equipment
- 2.4.3b Errors
- 2.4.3b(a) Human/gross errors
- 2.4.3b(b) Systematic equipment errors
- 2.4.3b(c) Random errors
- 2.4.4b Undertaking fieldwork surveys
- 2.4.4b(a) Linear surveys
- 2.4.4b(b) Levelling surveys
- 2.4.4b(c) Reading and recording angles on a closed traverse
- 2.4.4b(d) The mathematical principles required when carrying out the above tasks
- 2.4.5b Drawings of completed fieldwork surveying
- 2.4.5b(a) The conventions and notation required in developing drawings
- 2.4.5b(b) Plotting survey lines accurately
- 2.4.5b(c) Cross sections and long sections Development Concepts
- 2.4.7 Converting, adapting and changing the use of buildings or land
- 2.4.7(a) Alternative uses for buildings or land
- 2.4.7(b) Factors influencing conversion or change of use
- 2.4.7(c) The processes and legislative requirements involved
- 2.4.7(d) Feasibility reports
- 2.4.7(e) Working drawings for proposed ideas
- 2.4.7(f) Planning materials for development aims and safety
- 2.4.8 Effective management
- 2.4.8(a) Management and leadership style
- 2.4.8(b) Project management teams: roles, responsibilities, interdependencies and decision-making roles
- 2.4.8(c) Uses of BIM technologies
- 2.4.8(d) Contingency planning
- 2.4.9 Resource planning
- 2.4.9(a) Cash flow
- 2.4.9(b) Ordering and scheduling material deliveries
- 2.4.9(c) Human resource requirements, including health and safety needs
- 2.4.9(d) Plant resource needs
- 2.4.9(e) Site storage
- 2.4.9(f) Supervision of workforce and quality assurance of output
- 2.4.10 Handover
- 2.4.10(a) RIBA Plan of Work Stages 6 and 7
- 2.4.10(b) Commissioning building services installations
- 2.4.10(c) Health and safety files
- 2.4.10(d) Handover period
- 2.4.10(e) The completion period and client feedback
- 2.4.11 Construction management techniques
- 2.4.11(a) Master programmes: Gantt charts and critical path
- 2.4.11(b) Risk assessments and method statements (RAMS)
- 2.4.11(c) Quality assurance systems and testing methods
- 2.4.11(d) Management of human resources and subcontractors Purchasing and financial management
- 2.4.12 Purchasing methods
- 2.4.12(a) Suitable and reliable suppliers
- 2.4.12(b) Seeking and evaluating quotations for materials and sub-contractors
- 2.4.12(c) Delivery lead times and just-in-time delivery
- 2.4.12(d) Purchasing locally, sustainably, ethically and in a socially responsible way
- 2.4.12(e) Fixed, single and serial contracts
- 2.4.12(f) Using purchase orders
- 2.4.13 Costs and taking off quantities
- 2.4.13(a) Materials
- 2.4.13(b) Labour
- 2.4.13(c) Cost value comparisons
- 2.4.13(d) Managing costs/cost savings
- 2.4.14 Bill of quantities
- 2.4.14(a) Preliminary items
- 2.4.14(b) Prices
- 2.4.14(c) Units and dimensions
- 2.4.14(d) New Rules of Measurement Programme of activities
- 2.4.15 Producing programmes of activities
- 2.4.15(a) Selecting the most appropriate master programme
- 2.4.15(b) Rams
- 2.4.15(c) Site layout
- 2.4.15(d) Site storage
- 2.4.15(e) Visual monitoring tools
- 2.4.15(f) Site traffic management plans
- 2.4.15(g) Waste management plans
- 2.4.16 Ensuring progress
- 2.4.16(a) Causes and impacts of project delays
- 2.4.16(b) Overcoming delays
- 2.4.16(c) Facilitating ahead-of-schedule progress
- 2.4.16(d) Adopting and adapting contingency plans