WJEC A Level Built Environment 1509QS · 2.4.10(e)
The completion period and client feedback
- Code
- 2.4.10(e)
- In
- 2.4.10 Handover
- Topic
- 2.4 A level Unit 4: Construction practices
- Course
- A Level Built Environment 1509QS
- Board
- WJEC
Codes and titles are read by a script from WJEC's published specification and have not been checked by a person. What each point covers is in the specification itself: WJEC’s specification.
Points in 2.4.10 Handover
- 2.4.10(a) RIBA Plan of Work Stages 6 and 7
- 2.4.10(b) Commissioning building services installations
- 2.4.10(c) Health and safety files
- 2.4.10(d) Handover period
- 2.4.10(e) The completion period and client feedback