WJEC A Level Built Environment 1509QS · 2.4.5b
Drawings of completed fieldwork surveying
- Code
- 2.4.5b
- In
- 2.4 A level Unit 4: Construction practices
- Course
- A Level Built Environment 1509QS
- Board
- WJEC
Codes and titles are read by a script from WJEC's published specification and have not been checked by a person. What each point covers is in the specification itself: WJEC’s specification.
Points under 2.4.5b
Points in 2.4 A level Unit 4: Construction practices
- 2.4.1a Residential and commercial properties
- 2.4.2a Building deterioration and degradation
- 2.4.3a Surveying equipment
- 2.4.4a Planning to conduct a building survey
- 2.4.5a Examining and recording findings
- 2.4.6a Completing a building survey and measured survey
- 2.4.1b Linear, levelling and angular measurements
- 2.4.2b Fieldwork surveys equipment
- 2.4.3b Errors
- 2.4.4b Undertaking fieldwork surveys
- 2.4.5b Drawings of completed fieldwork surveying
- 2.4.7 Converting, adapting and changing the use of buildings or land
- 2.4.8 Effective management
- 2.4.9 Resource planning
- 2.4.10 Handover
- 2.4.11 Construction management techniques
- 2.4.12 Purchasing methods
- 2.4.13 Costs and taking off quantities
- 2.4.14 Bill of quantities
- 2.4.15 Producing programmes of activities
- 2.4.16 Ensuring progress