Specification points
WJEC AS Built Environment 2509QS
88 points in 2 topics, with WJEC's codes and titles.
Codes and titles are read by a script from WJEC's published specification and have not been checked by a person. What each point covers is in the specification itself: WJEC’s specification.
2.1 AS Unit 1: Our built environment
- 2.1.1 The life cycle of buildings and structures
- 2.1.1(a) Stages in the life cycle of buildings
- 2.1.2 Low-rise and high-rise structures in the built environment
- 2.1.2(a) Types of structures
- 2.1.2(b) Features of these structures
- 2.1.2(c) Uses and purposes of structures
- 2.1.3 Professional and technical careers and roles in the built environment
- 2.1.3(a) Architecture
- 2.1.3(b) Civil and structural engineering
- 2.1.3(c) Surveying
- 2.1.3(d) Site and project management
- 2.1.3(e) Quantity surveying
- 2.1.3(f) Town planning
- 2.1.3(g) Building services engineering
- 2.1.4 Organisations in the built environment
- 2.1.4(a) Small and medium-sized enterprises
- 2.1.4(b) Nationwide and global companies
- 2.1.4(c) Contracting and sub-contracting
- 2.1.4(d) Tendering, procurement and relevant legislation
- 2.1.4(e) Local authority planning departments
- 2.1.4(f) Trade and industry training bodies
- 2.1.4(g) Trade registration and development schemes
- 2.1.5 Structures of low-rise domestic and commercial buildings
- 2.1.5(a) On-site and off-site structural forms
- 2.1.5(b) The advantages and disadvantages of different structure types
- 2.1.5(c) Traditional (pre- 1919) structure types
- 2.1.5(d) Modular construction
- 2.1.6 Designing and constructing substructures (in contemporary practice)
- 2.1.6(a) Methods for investigating subsoil
- 2.1.6(b) Producing information for foundation design
- 2.1.6(c) Methods for improving subsoil
- 2.1.6(d) The types of building foundation
- 2.1.6(e) Principles for designing foundations
- 2.1.6(f) Basement excavation, retaining walls and damp-proof courses
- 2.1.7 Designing and constructing superstructures (in contemporary practice)
- 2.1.7(a) Types of ground floor construction
- 2.1.7(b) Types of intermediate floor construction
- 2.1.7(c) Designing stairs and open spaces
- 2.1.7(d) Types of internal wall and partitioning
- 2.1.7(e) External walls and cladding
- 2.1.7(f) Designing openings in walls
- 2.1.7(g) Finishing floors and ceilings
- 2.1.8 Designing the services requirements for buildings (in contemporary practice)
- 2.1.8(a) Services requirements for different types of buildings
- 2.1.8(b) The design of services at different points in the construction process
- 2.1.9 Change of use
- 2.1.9(a) Altering, refurbishing and extending existing buildings
- 2.1.9(b) Issues of compatibility and using consistent materials
- 2.1.9(c) Pre-1919 buildings and structures
- 2.1.10 External works
- 2.1.10(a) Foul and surface water drainage
- 2.1.10(b) Sustainable urban drainage systems
- 2.1.10(c) Installation/distribution of utility services
- 2.1.10(d) Methods for creating footpaths and roads
2.2 AS Unit 2: Design and planning practices
- 2.2.1 Stages involved in the design process
- 2.2.1(a) Stages 0 – 4 of the RIBA Plan of Work
- 2.2.1(b) The activities undertaken at each of these stages
- 2.2.2 Factors influencing the design process
- 2.2.2(a) Site information and constraints
- 2.2.2(b) Planning parameters and constraints
- 2.2.2(c) Statutory requirements and constraints
- 2.2.2(d) Environmental requirements and constraints
- 2.2.2(e) Social requirements and constraints
- 2.2.2(f) Budgetary and economic constraints
- 2.2.2(g) Construction (Design and Management) regulations
- 2.2.3 Initial project briefs
- 2.2.3(a) Setting project parameters
- 2.2.3(b) Setting project outcomes
- 2.2.3(c) Outlining possible design ideas and specifications
- 2.2.3(d) Writing briefs for a specific and intended audience
- 2.2.4 Producing designs
- 2.2.4(a) A range of 2D and 3D sketches and drawings
- 2.2.4(b) The techniques, principles and conventions of manual drawing
- 2.2.4(c) Technical, component and material annotations
- 2.2.5 Virtual modelling design
- 2.2.5(a) Using 2D and 3D virtual modelling outputs
- 2.2.5(b) Setting up virtual modelling projects and using common methodologies
- 2.2.5(c) Producing virtual models and rendering
- 2.2.6 Planning construction methods and techniques
- 2.2.6(a) The primary and secondary requirements of low-rise and medium-rise buildings
- 2.2.6(b) The requirements for working with buildings from different periods
- 2.2.6(c) Contemporary construction methods for substructures and superstructures
- 2.2.6(d) Sustainable construction methods, techniques and considerations
- 2.2.6(e) Water and waste water systems design and construction
- 2.2.6(f) Landscape design
- 2.2.6(g) Site design